NOIDA is named in the applicability section of the UP industrial-authority model building regulations 2026. That document is separate from the 2025 development-authority byelaws. Before relying on it for a NOIDA plot, verify the authority’s implementation order, application date and allotment or lease conditions.
Which 2026 PDF is linked here?
The official Invest UP searchable publication contains 200 pages. Its first page cites Notification 5322/77-4-26 dated 12 October 2026, and section 1.1 names NOIDA among the industrial development authorities. The 203-page supplied source also contains an implementing order. Download these as model-regulation sources, not as a parcel-specific sanction.
Government of Uttar Pradesh / Invest UP · Base document ↗ Government of Uttar Pradesh / Invest UP · Order and regulations ↗What still needs verification in NOIDA
The model document alone does not establish the local implementation record for a particular application. Use NOIDA’s official portal to obtain the applicable regulations, directions and orders. Record the lease/allotment terms and any prior approved FAR; do not replace those facts with a general online table. Our guide does not independently confirm a local commencement date.
New Okhla Industrial Development Authority · Official portal ↗How the massing study relates to these regulations
The current numerical engine is based on this supplied 2026 model framework. It models FAR-counted floor area, stilt height, setbacks, coverage and selected open-space/fire constraints. Some provisions and conflicts remain unresolved. Read the source-linked controls and review flags; a model that fits those controls is still not a NOIDA approval.
Why a bigger FAR number may not produce more usable building
Road-width bands and conditional purchase provisions belong to a specific category and framework. Even with additional entitlement, height-dependent setbacks can shrink the footprint, and access or usable floor planning can limit capacity. Study the remaining allowance and achievable geometry separately.
Common questions
Are the 2025 UP and 2026 NOIDA-related model PDFs the same?
No. Their issuing framework and stated applicability differ. Use the one applicable to the authority and site, with local implementation checked.
Does unrestricted FAR mean unrestricted construction?
No. Any relevant setbacks, access, height clearances, layout and other statutory requirements still have to be satisfied. The model does not prove a global maximum.
How this guide was checked
Links and document identity were checked against official publisher pages on 3 November 2026. This is source navigation and explanation, not an independently signed regulatory opinion. No complete amendment consolidation, parcel-specific local adoption review or professional sign-off is claimed. Numerical calculator coverage is stated separately.